Local Development Framework Banner
 TEXT ONLY HOME   |   S C I   |   L D Ds   |   L D S   |   S E A / S A CONTACT US"
LDF Home Page
LDF Process
Local Dev. Docs
Brinsbury
Core Strategy Review
Core Strategy
Allocations of Land
Proposals Map
Dev. Control Policies
Post Hearing
Resp. Statements
Position Statement
Public Examination
Alternative Policies
Design Guidance
Reserve Housing
Gypsies & Travellers
Background Docs
Housing Land
Design Statements
Parish Plans
Alternative Sites
Supplementary Docs
Storrington Diamond
West of Horsham
West of Crawley
Representations






DOWNLOADS Acrobat Reader
Winzip Utility




Horsham District Local Development Framework - Post Hearing Annual Monitoring - home  >  Local Development Documents  >  Post Hearing

POST-HEARING CHANGES PRODUCED BY HORSHAM DISTRICT COUNCIL FOR THE EXAMINATION

During the Examination Hearings from the 4th September 2007 to 7th September 2007, the Council agreed to submit its suggested changes to certain parts of the General Development Control Policies Document to reflect the discussions which took place, for consideration by the Inspector.

The Council's Post-Hearing Changes have been produced if required, shortly after each session. These identify the changes the Council would definitely wish to make following the hearing, but does not include those changes the Council did not propose. These can be viewed by opening the following links:

Post-Hearing Submission Policy DC 1

Post-Hearing Submission Policy DC 22

Post-Hearing Submission Policy DC 30



3rd December 2008


Storrington


Leonardslee Pond


The Bus Garage


Amberley



HOME   |   S C I   |   L D Ds   |   L D S   |   S E A / S A CONTACT US