Search results

You searched for construction - showing 281–290 of 403 results.

Urban Housing Potential Study 2004-2018

File format: PDF/Adobe Acrobat

There are therefore a number of sites identified as having potential at 31st March 2004 that subsequently have the benefit of planning permission and are under construction.

Horsham District Local Plan Interim SA Non-Technical Summary of sites _ growth options

File format: PDF/Adobe Acrobat

Carbon emissions in the built environment can be reduced through energy efficient design and construction, and the inclusion of low energy (e.g. ... the potential to be reduced through energy efficient design and construction, and the inclusion of low

Place Services Horsham Local Plan Habitat Regulations Assessment 30 Jan 2020

File format: PDF/Adobe Acrobat

2. […] the competent authority is permitted to grant to a plan or project consent which leaves the developer free to determine subsequently certain parameters relating to the construction phase, such as ... the location of the construction compound and

Habitat Regulation Assessment

File format: PDF/Adobe Acrobat

Habitats Regulations Assessment of the Horsham District Planning Framework . Horsham District Council . April 2014 . Horsham District Planning Framework – Habitats Regulations Assessment. April 2014  2 Version 4 ‐ Final.

MSDC District Plan 2038 – Polices for WSCC review ...

File format: PDF/Adobe Acrobat

DPS2: Sustainable Design and Construction. Sustainable design and construction. Sustainability measures including water efficiency.

Audited Statement of Accounts 2020-21

File format: PDF/Adobe Acrobat

Statement of Accounts 2020/21. Audited. 33. Contents. Page. Narrative Statement 2. Statement of Responsibilities 9. Independent Auditors Report and Opinion 10. Core Financial Statements Movement in Reserves Statement 13 Comprehensive Income and

Storrington Sullington Parish Design Statement

File format: PDF/Adobe Acrobat

Below: 1972 construction of flats and houses in Hawthorn Way and Old Mill Drive with the Bine Mill still visible to the left. ... in keeping (see Section 2.6). Sustainable development and use of eco friendly construction techniques.

Billingshurst Village Centre Supplementary Planning Document

File format: PDF/Adobe Acrobat

The village centre, due to its construction andtopography, has been prone to surface water flooding. • ... Larger buildings. Smaller retail spaces. Retail buildings highlighted - indicative footprint has been included for the new convenience store

241122 Horsham MIQs Response_Matter 9_ISSUE VERSION

File format: PDF/Adobe Acrobat

which would conflict with the land Safeguarded for its expansion through the construction of a wide spaced southern runway.

Unaudited Statement of Accounts 2021-22 updated HDC version 16 March 23

File format: PDF/Adobe Acrobat

2,415 - Vehicles, Plant, Furniture & Equipment 1,788 12. 283 - Assets under construction/Awaiting Development 5 12.