Search results

You searched for construction - showing 181–190 of 385 results.

Date: 04 July 2024 Our ref: 478271 Your ref: ...

File format: PDF/Adobe Acrobat

This includes:. • A description of the development – including physical characteristics and the full land use requirements of the site during construction and operational phases. • ... site impacts. Further information is available in the Defra

1 Horsham District Local Plan Examination Horsham District Council ...

File format: PDF/Adobe Acrobat

that new development that takes place is as a minimum designed to be net zero carbon zero carbon emissions in construction and operation. ... Criteria within Strategic Policy 8: Sustainable Design and Construction should also be considered and addressed.

Richmond Road Conservation Area Appraisal and Management Plan

File format: PDF/Adobe Acrobat

Many buildings within the Conservation Areas are little altered from. the time of their construction. ... in construction.

Other Reports Template

File format: PDF/Adobe Acrobat

100-PT-PMG-00000-000004

Hackney Carriage and Private Hire Vehicle licence conditions

Licence conditions for Hackney Carriages and private hire vehicles in Horsham District.

Economic Growth Assessment

File format: PDF/Adobe Acrobat

industries from professional services and recreation to construction and. wholesale. 2.40 Many rural businesses face particular challenges to continued economic.

Final Report Part A _03-09-09-nxi_

File format: PDF/Adobe Acrobat

PREPARED BY. GL Hearn Property Consultants 20 Soho Square London W1D 3QW Tel: 44 (0)20 7851 4900 Fax: 44 (0)20 7851 4910 Email: info@glhearn.com www.glhearn.com Date: September 2009 Ref: J:PlanningJob FilesJ021299 - Economic Appraisal of Gatwick

1 Horsham Local Plan Examination Written statement from Save ...

File format: PDF/Adobe Acrobat

HDC has already drawn attention to the potential air pollution impact of the construction phase (ref. ... However, further in-depth consideration and mitigation measures will be needed with respect to the construction of the bridge over the River Mole

L19_SP08 Slinfold Conservation Area Appraisal

File format: PDF/Adobe Acrobat

Many buildings within the Conservation Areas are little altered fromthe time of their construction and designated in their own right aslisted buildings. ... Ordnance Survey 1895/96 indicates the construction of Slinfold Chapel in 1878, and South Lodge to

Supply of bulk and wheeled bins for housing developments Policy

This policy identifies who is responsible for the provision and maintenance of wheeled bins at any Household in the district.